Skip to main content
EU Blue Economy Observatory
Call for proposalsClosed

Developing a flexible offshore supply of zero emission auxiliary power for ships moored or anchored at sea deployable before 2030 (ZEWT Partnership)

Details

Status
Closed
Publication date
13 December 2022
Opening date
Deadline model
Single-stage
Deadline date
20 April 2023, 17:00 (CEST)

Description

Clean and competitive solutions for all transport modes (HORIZON-CL5-2023-D5-01)

TOPIC ID: HORIZON-CL5-2023-D5-01-14

Project outputs and results are expected to contribute to the following expected outcomes:

  • In close cooperation with ship owners, operators and ports, demonstration and testing of an innovative solution to provide auxiliary power and possibly battery charging for ships moored and anchored at sea which will cut pollution and GHG’s and which can be deployable before 2030;
  • Developing guidelines on technical, operational and safety aspects for the provision of offshore power supply services;
  • Assessing the GHG and polluting emission savings from ships moored or at anchor through verifiable KPIs;
  • Assessment of the CAPEX and OPEX of the developed solution and optimisation of the concept to increase the financial viability of the developed solution.

FOR MORE INFORMATION